IGA

SECONDARY SCHOOL NO. 134

SECONDARY SCHOOL NO. 134 SECONDARY SCHOOL NO. 134 Implemented Works: • Fine work• Facade design• Aluminum systems design and installation• Facade glazing, preparation and installation of ventilated facade systems• Sandstone installation Project information DATE 2014

Paving works of pedestrian paths in the “Alatava Forest Park” project

Paving works of pedestrian paths in the “Alatava Forest Park” project Paving works of pedestrian paths in the “Alatava Forest Park” project Project information https://iga.birsaytnumune.xyz/wp-content/uploads/2025/01/WhatsApp-Video-2021-01-07-at-15.07.36-1-1.mp4https://iga.birsaytnumune.xyz/wp-content/uploads/2025/01/Video2.mp4https://iga.birsaytnumune.xyz/wp-content/uploads/2025/01/Video3.mp4

PARK INN HOTEL

PARK INN HOTEL PARK INN HOTEL Implemented Works: • Fine work• Facade design• Aluminum systems design and installation• Facade glazing, preparation and installation of ventilated facade systems• Sandstone installation Project information DATE 2011

“AZERGOLD” DASHKASAN

“AZERGOLD” DASHKASAN Construction of “Azergold” Gold Refinery Laboratory in Jovdar village of Dashkasan — 2015 Project information

RENOVATED ABSHERON BRANCH OF “AZERPOCHT” LLC

RENOVATED ABSHERON BRANCH OF “AZERPOCHT” LLC RENOVATED ABSHERON BRANCH OF “AZERPOCHT” LLC Project information https://iga.birsaytnumune.xyz/wp-content/uploads/2025/01/2022-10-24-12-20-36.mp4https://iga.birsaytnumune.xyz/wp-content/uploads/2025/01/2022-10-24-12-21-15.mp4

Tire Recycling Plant in Balakhani Industrial Park.

Tire Recycling Plant in Balakhani Industrial Park Tire Recycling Plant in Balakhani Industrial Park https://iga.birsaytnumune.xyz/wp-content/uploads/2025/01/Balaxani.mp4 Project information DATE 2019-2020